Electrical Install; Initial Start-Up - Bunn trifecta Technical Training Manual

Hide thumbs Also See for trifecta:
Table of Contents

Advertisement

Electrical Install

Step 1: Use a voltmeter to verify the correct voltage supply.
Step 2: The brewer must be disconnected or unplugged until specified in the initial setup section.
Optional Drain Hook-up
Step 1: Remove the drip tray and the chrome plug from the base.
Step 2: Drill out the auxiliary outlet on the drip tray with a 1/2" drill bit.
Step 3: Secure a 5/8" hose to the drip tray; routing it through the
opening in the base assembly.
Step 4: Connect the hose to the drain line as needed.
Step 5: Install the drip tray.
Initial Setup
Step 1: Install the check valve.
Step 2: Install the clear brew chamber, brew cup and then lock into position.
Step 3: Place an empty container under the brew chamber.
Step 4: Connect the brewer to the power source.
Step 5: Press the brew start switch and allow the water to flow into the brew tank. Some excess water will flow into
the receiving container.
Step 6: Wait approximately five minutes for the water in the tank to heat to the proper temperature. The display will
read "HEATING" until the tank reaches it's operating temperature. Some water will drip from the brew
chamber during this time; this is due to expansion and should not occur thereafter. Any excess water in the
brew chamber will be purged automatically at the end of the initial setup.
Step 7: Water volumes and flow settings have been preset at factory default. Refer to the "Adjusting Brewing
Parameters" section of the "Installation & Operating Guide" if the parameters need to be adjusted.
Step 8: If the instruction in this section was followed correctly, the brewer is now ready for use.
Brew Cup
Brew Chamber
Check Valve
Bunn-O-Matic Corporation
5

Advertisement

Table of Contents
loading

Table of Contents