Advertisement

Unit Objectives

Given a realistic scenario depicting a new site install, the learner will be able to install and setup the trifecta coffee
brewer for customer turnover without error.
Given a new trifecta, all the necessary tools and safety equipment, the learner will be able to install
the brewer without error.
The learner will be able to verify that the site requirements have been met.
The learner will be able to locate and document the serial number.
The learner will be able to hook up the water supply.
The learner will be able to hook up the electrical supply.
The learner will be able to power on the brewer.
The learner will be able to perform initial setup.
U
1 i
nit
nstallation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Trifecta and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Bunn Trifecta

  • Page 1 Unit Objectives Given a realistic scenario depicting a new site install, the learner will be able to install and setup the trifecta coffee brewer for customer turnover without error. Given a new trifecta, all the necessary tools and safety equipment, the learner will be able to install the brewer without error.
  • Page 2: Site Requirements

    Installation Site Requirements Space • trifecta dimensions are 23” H x 12” W x 12” D • Weight 35 lbs Plumbing • 1/4 male flare fitting • Dedicated water supply with shut-off • Connected to cold water supply • Water pressure 20-90psi, 50psi if regulator is needed Electrical • 120VAC, 2 wire plus ground...
  • Page 3: Initial Setup

    Parameters” section of the “Installation & Operating Guide” if the parameters need to be adjusted. Step 8: If the instruction in this section was followed correctly, the brewer is now ready for use. Brew Chamber Check Valve Brew Cup Bunn-O-Matic Corporation...

Table of Contents