Fujitsu PRIMEQUEST 520A Installation Planning Manual page 45

Hide thumbs Also See for PRIMEQUEST 520A:
Table of Contents

Advertisement

*1:
The main unit does not include an IOU/IOX Unit. IOU or IOX unit must be
prepared.
*2:
For PRIMEQUEST 520A*/520: x4
For PRIMEQUEST 420: x2
*3:
The main unit does not include an IOX. To connect the PCI_Box, one unit
must be prepared.
*4:
The PCI_Box includes neither a PCIU nor a PEXU. At least one of those
units must be prepared.
*5:
Up to two PEXUs can be connected to the PRIMEQUEST 520A*/520 main
unit.
*6:
PEXUs are connected by PCI unit cables (combination of CH#0/#1 and
CH#2/#3 on the main unit side).
*: not supported by Fujitsu Technology Solutions
U41644-J-Z816-5-76
Figure 2.2 Equipment cable connections (2/2)
Laufende K/F 1
2-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 520Primequest 420

Table of Contents