Dometic 9200 Series Installation Instructions Manual page 14

Power awning
Table of Contents

Advertisement

Installing the Awning
7 .4 .3 RGB LED Light Connections
Complete this procedure only if the awning is
I
equipped with an RGB LED light strip.
22 Making the RGB Light Connections
LED Light Strip
q
Connector
1. Feed the LED controller box's 4-pin end behind
the awning pivot pin and connect to the LED strip
connector.
I
The ends are keyed to join in a specific orientation.
Do not force together if misaligned.
2. Thread the connector nut onto the 4-pin end and
tighten until snug (do not over-tighten).
3. Before mounting the LED controller box, move the
red and black power wiring aside and away from
inside the back channel.
I
The LED controller box cannot be moved once
positioned with adhesive.
4. Peel away the film on the back of the LED controller
box to expose the adhesive backing.
5. Position and press into the back channel, allowing
enough slack to accommodate possible fabric
movement.
14
q
w
LED Controller Box
w
q
w
r
23 Mounting and Connecting the LED Controller Box
LED Controller Box
q
Back Channel
w
6. Route the red and black power wire(s) along the
side(s) of the LED controller box and inside the back
channel.
If there are two wires, place one wire on each side
I
of the LED controller box.
7. Connect the LED controller box's 2-prong connector
end to the power wire in the hardware.
8. Pull any slack wiring out the bottom of the channel to
prevent pinched or damaged wiring during awning
operation.
9200 Series Power Awning
e
Red/Black Wires
e
Power Wire Connector
r
EN

Advertisement

Table of Contents
loading

Table of Contents