Generate A Work Order - 3Com Wireless LAN Controller WX2200 User Manual

Wireless lan mobility system wireless lan switch manager
Hide thumbs Also See for Wireless LAN Controller WX2200:
Table of Contents

Advertisement

Generate a Work
Order
If the coverage area provided by a MAP on the floor above or below is
one meter or less, 3WXM displays a message. This coverage area is not
displayed on the floor plan.
You can generate a work order as part of your wireless network
planning. The work order provides all of the necessary information for the
physical installation of the 3Com Mobility System. A work order shows
where the MAPs should be installed, WX initial setup configuration
information, and projected RSSI information that is useful when verifying
the installation.
To generate a work order
1 Display the floor plan in the Content panel.
2 In the Task List panel, click RF Planning.
3 Under RF Planning, click Work Order Report. The Work Order
Generation dialog is displayed.

Generate a Work Order

151

Advertisement

Table of Contents
loading

Table of Contents