Srepn Installation; Check Customer's Order; Correcting Shipping Errors; Unpack And Inspect - Avaya DEFINITY Series Installation And Maintenance Manual

Enterprise communications server
Hide thumbs Also See for DEFINITY Series:
Table of Contents

Advertisement

DEFINITY Enterprise Communication Server Release 9
Installation and Maintenance for Survivable Remote EPN 555-233-121
1

SREPN Installation

Check customer's order

SREPN Installation
Check customer's order
Check the customer's order and the shipping packing lists to confirm that all
equipment is present. If any equipment is missing, report this to your Avaya
representative.

Correcting shipping errors

1. Red-tag all defective equipment and over-shipped equipment and return
according to the nearest Material Stocking Location (MSL) instructions. For
international customers, contact your order service agent.
2. Direct all short-shipped reports to the nearest MSL. Contact the
appropriate location for specific instructions. For Streamlined
Implementation in the United States, call 1-800-772-5409.

Unpack and inspect

READ THIS FIRST!
!
CAUTION:
A fully loaded system weighs approximately 48 lbs (22 kg). Use lifting precautions.
1. Verify the equipment received. See
equipment may vary in appearance and may ship in separate packages.
2. Refer to
Survivable Remote Processor (SRP) and Expansion Port Network (EPN)
parts and comcodes.
Table 1-1 on page 1-3
Figure 1-1 on page
through
Table 1-7 on page 1-6
Issue 2
November 2000
1-1
1
1-2. Actual
for a list of

Advertisement

Table of Contents
loading

Table of Contents