Advertisement

Operation Manual
WBL-100/101/200
3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529
mrc
@
mrclab
.
com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WBL-100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MRC WBL-100

  • Page 1 Operation Manual WBL-100/101/200 3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529 mrclab...
  • Page 2 General Comments  Use distilled water or prepare anti-freeze solution with 50% distilled water + 50% ethylene glycol.  Do not use tap water, ion-free water, corrosive or food liquids or chemicals that can damage the stainless-steel bath, the cooling pipes and the internal parts of the bath (heating element, temperature sensor, circulation pump, water level sensor) ...
  • Page 3 Construction Control Unit Internal View Back View 3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529 mrclab...
  • Page 4 WBL-100 (without External Pump) WBL-101/200 (with External Pump) 3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529 mrclab...
  • Page 5 NOVA ST-140 Main Temperature Controller This control is marked TEMP. CONTROL and consists of the digital display and UP and DOWN arrow pads for inputting set point temperatures and calibration. PV- display of actual temperature inside cabinet. SV- Set-up temperature indicator. AT- Automatic Calculation P.I.D OUT-Control system output indicator ALM- Over-temperature protection indicator.

This manual is also suitable for:

Wbl-101Wbl-200

Table of Contents