Lcd Interface Introduction - Project EV ATESS EVA-11S Quick Installation Manual

3-phase ac charger
Table of Contents

Advertisement

5.2 LCD interface introduction

Interface of standby status.
Charging mode is displayed at
the bottom centre of the screen.
Interface of user card information
Displayed for user to check card ID
and balance when swiping RFID
card while EV is not connected
Interface of charging status.
Displayed when the charging is
being carried out. There is charging
time, consumed electricity,
charging cost on it, as well as
real-time charging voltage and
charging current.
Interface of charging complete.
Displayed when the EV stops
charging, or forced on/off button
is pressed on charger side.
Interface of billing.
After scanning QR code or swiping
RFID card for billing, this interface
will open up to display user
ID/charging time/cost/balance,
etc.This interface will also come
out when you stop charging on
the Project EV APP or when you
press the forced on/off button
or unplug the gun at
Plug&Charge mode.
Interface of fault status.
Displayed with fault code and fault
description when fault occurs.
Interface of reserved status.
If the back-office server and APP
support reservation function and
the charger is reserved, this
interface will come out showing
user ID and remaining time to
reserved time.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atess eva-22sAtess eva-44s

Table of Contents