1.3.1 Power-Up Tests

The system runs the power-up tests each time you turn on the system. After
successful completion of tests, the system will either enter Console mode or
proceed to automatic bootstrap, depending on the HALT action selected by
the user. If HALT action is Default, Halt, or Restart, then the system enters
console mode. If HALT action is Reboot or Restart_reboot, then the system
proceeds to boot. The following example shows a typical display for a system
that passes all tests and then enters console mode.
Figure 1–1 Successful Power-Up Test Display
KA50-A V2.3, VMB 2.14
Performing normal system tests.
74..73..72..71..70..69..68..67..66..65..64..63..62..61..60..59..
58..57..56..55..54..53..52..51..50..49..48..47..46..45..44..43..
42..41..40..39..38..37..36..35..34..33..32..31..30..29..28..27..
26..25..24..23..22..21..20..19..18..17..16..15..14..13..12..11..
10..09..08..07..06..05..04..03..
Tests completed.
>>>
£
Central Processing Unit (CPU) Name, Firmware Version Number, and
Virtual Memory Boot (VMB) Version Number
Read-Only Memory (ROM) Based Diagnostics Countdown
¡
Status Message
¢
Console Prompt
£
The following example shows a typical display for a system that passes all
tests and then enters automatic bootstrap.
KA50-A V2.3, VMB 2.14
Performing normal system tests.
74..73..72..71..70..69..68..67..66..65..64..63..62..61..60..59..
58..57..56..55..54..53..52..51..50..49..48..47..46..45..44..43..
42..41..40..39..38..37..36..35..34..33..32..31..30..29..28..27..
26..25..24..23..22..21..20..19..18..17..16..15..14..13..12..11..
10..09..08..07..06..05..04..03..
Tests completed.
Loading system software.
(BOOT/R5:0 EZA0)
2..
-EZA0
1..0..
1–10 Troubleshooting and Diagnosing Problems
¢
¡