TriangleTube Prestige SOLO 299 Instructions

TriangleTube Prestige SOLO 299 Instructions

Acvmax boilers natural to propane instructions

Advertisement

Applicable Kit Part Number:
-
PARKIT67
Kit Includes:
-
Rating Label
-
Conversion Label
-
(1) Propane Gas Orifice
-
T-25 Torx Wrench
Recommended Tools
-
Adjustable Wrenches
-
Phillips-Head Screwdriver
-
Flat-blade Screwdriver
-
Calibrated Combustion Analyzer
W RNING
Indicates a potentially hazardous situation
which, if ignored, can result in substantial
property damage, serious injury, or death.
W RNING
Failure to follow instructions below can
result in substantial property damage, seri-
ous injury, or death.
Instructions are for a qualified installer
or service technician.
Read all instructions before proceeding.
Follow instructions in proper order.
W RNING
For your safety, turn off electrical power
supply at service panel before proceeding to
avoid possible electrical shock hazard.
Failure to do so can result in substantial
property damage, serious injury, or death.
Prestige SOLO 299/399
ACVMax Boilers
Natural to Propane Instructions
NOTI E
Indicates special instructions on installa-
tion, operation or maintenance, which are
important to equipment but not related to
personal injury hazards.
NOTI E
Upon completion of the conversion from
Natural Gas (NG) to Propane (LP), affix the
new rating label included in the kit to the
unit adjacent to the existing rating label. DO
NOT affix the new label over the existing rat-
ing label. Add propane conversion labeling to
the gas valve.
NOTI E
These instructions cover NG to LP conversion
for ACVMax controlled Prestige Solo 299 &
399 boilers only. Each kit is supplied with one
orifice suitable for use with that particular
boiler model.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Prestige SOLO 299 and is the answer not in the manual?

Questions and answers

Summary of Contents for TriangleTube Prestige SOLO 299

  • Page 1 NOTI E W RNING These instructions cover NG to LP conversion for ACVMax controlled Prestige Solo 299 & For your safety, turn off electrical power 399 boilers only. Each kit is supplied with one supply at service panel before proceeding to orifice suitable for use with that particular avoid possible electrical shock hazard.
  • Page 2 Prestige SOLO 299/399 - ACVMax Boilers Natural to Propane Instructions 1.0 Installation of the Propane Orifice 1. Turn off the electrical power supply to the boiler. 2. Close the manual gas shut off valve to the unit. 3. Remove the front panel of the Prestige by removing the screws along the bottom edge of the unit.
  • Page 3 Prestige SOLO 299/399 - ACVMax Boilers Natural to Propane Instructions 14. Reattach the air inlet elbow to the venturi. W RNING 15. Replace the front jacket panel and secure with screws. Failure to retain both rubber o-rings on the brass union collar will cause an improper seal 16.
  • Page 4 Prestige SOLO 299/399 - ACVMax Boilers Natural to Propane Instructions 2.0 Combustion Test and Adjustments W RNING 1. The installer MUST perform a complete com- The gas valve outlet pressure is factory set to the bustion check to ensure the following combus- correct value and does not require field adjust- tion levels in Tables 2 and 3 are met at high and...
  • Page 5 Prestige SOLO 299/399 - ACVMax Boilers Natural to Propane Instructions NOTI E An adequate CH load must be present to dis- sipate the heat generated during the combus- tion test. If an adequate CH load is not avail- able an indirect water heater can be used to dissipate the heat by creating a DHW call which will enable the DHW circulator.

This manual is also suitable for:

Parkit67Prestige solo 399

Table of Contents