8.3.9 To connect the power consumption digital inputs
EPRA14~18DAV3+W1 + ETVZ16S18+23DA6V+9W
Daikin Altherma 3 H HT F
4P587503-1 – 2019.07
2 Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
A
B
A
B
a Installation of EKRP1HBAA is required.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection (voltage
supplied by PCB)
[9.9] Power consumption control.
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the power consumption digital inputs cable to the appropriate
terminals as shown in the illustration below.
N
X2
X1
X2
X1
X2M
A4P
a
"6.2.5 To open the indoor
8
Electrical installation
|
L
4
unit" [
48]):
1
Installer reference guide
3
2
99
Need help?
Do you have a question about the Altherma 3 H HT F and is the answer not in the manual?
Questions and answers