Download Print this page

Operation - Craftsman evolv Operator's Manual

Advertisement

Available languages

Available languages

HARDWARE:
1/4-20 Hex Nut
1/4-20 x 7/16 Hex Screw
8-32 x 1/4 Pan Head Screw
8-32 Hex Nut
10-16 x 1/2 & 1/4-14 x 5/8
Sheet Metal Screw
NOTE: Not all instructions apply
to your specific unit.
ASSEMBLY
REMOVE CHEST FROM ROLL-
AWAY:
• The unit comes with the chest secured
to the inside of the roll-away by either
two or four 1/4-14 x 5/8 screws.
• Lay the roll-away down on its back.
• Use packaging material to protect the
paint finish.
• Remove the securing screws from the
underside of the roll-away. Save the
screws for mounting the chest to the
roll-away.
• Remove the chest.
CASTER INSTALLATION:
NOTE: Use adequate manpower for
this operation.
• Lay the roll-away down on its back.
• Use packaging material to protect the
paint finish.
• Mount both swivel casters on the
same side of the roll-away. The swivel
caster with the brake goes to the front
of the unit.
• Attach casters using 1/4-20 x 7/16
hex screws and 1/4-20 hex nuts.
Wrench tighten.
• Return the roll-away to its upright
position.
MOUNTING CHEST:
• Remove the drawer from the roll-away
(refer to the drawer removal
instructions).
• Lift the chest onto the roll-away. Line
up the holes in the bottom of the chest
with the holes in the top of the
roll-away.
• Attach the chest using two 1/4-14 x
5/8 screws that were used to secure
the chest to the bottom of the roll-
away.
• Wrench tighten all screws.
• Replace the drawer (refer to the
drawer installation instructions).
• To remove the chest, reverse the
procedure.
RISER ASSEMBLY:
NOTE: When assembled, the riser should
be the same size, left to right, as the
chest. Use adequate manpower for this

operation.

• Assemble the sides and the back (flange
side up) together using four 8-32 x 1/4
pan head screws and four 8-32 hex nuts.
Finger tighten.
• Position the riser assembly on the roll-
away. Secure using four 10-16 x 1/2
3
sheet metal screws. Wrench tighten.
• Position the chest on the riser. Secure
using four 10-16 x 1/2 sheet metal
screws. Wrench tighten.
• Wrench tighten the risers four 8-32 x
1/4 pan head screws and 8-32 hex nuts.
OPERATION
REMOVING AND INSTALLING
DRAWERS:
• Fully extend the drawer. Push it back
1/4".
• Insert a screwdriver into the slot in the
slide and depress the stop until it
clears the lance.
• Repeat the procedure on the other
slide. Remove the drawer.
• To reinstall the drawer, pry the stop
far enough out to engage the lance
(3/16" to 1/4") and push the drawer
onto the slides until the stops pass
over the lances.
TO LOCK CHEST:
• Insert the lockbar (which stores in the
top tray), tabbed end up, into the slot
in the top tray and down into the slot in
the base. Close the cover and lock
with the key.
TO LOCK ROLL-AWAY &
INTERMEDIATE CHEST:
• Insert the lockbar into the slot in the
base. Move the lockbar toward the
unit until the bent end fits into the slot
near the lock. Lock with the key. The
lockbar for the intermediate chest is
stored in the intermediate chests top
drawer. The lockbar for the roll-away
is stored in a slot in the top front corner
of the unit.
TO LOCK TOOL CENTER:
• Insert the slotted end of the lockbar
through the slot in the top tray and
down into the slot on the panel and in
the base.
• The slot in the locking bar fits over the
knob on the panel.
• Close the cover and lock with a
padlock. (Padlock not included).
TO UNLOCK UNITS:
• Reverse the locking procedure.
PLASTIC BIN INSTALLATION:
• If your chest has plastic bins: Insert
the back of the bin at a slight angle into
the plastic sleeve. Straighten bin and
slide into position. Repeat for
remaining bins.
4

Advertisement

loading