4 Redundant 24 V DC power supply
4.5
Creating a process picture
You need a process picture to visualize the status of the redundant power supply.
The procedure is as follows:
1. Create a new process picture or open an existing one (1) in the folder of the
technological hierarchy in which the CFC plan that you edited before is located.
Fig. 4-7
2. Execute the Compile OS function so that the system creates the process
variables and the messages in the OS project as well as the block icons in the
process picture.
3. Open the process picture using the WinCC Graphics Designer.
4. Draw the process picture as you want it to appear and position the block icons
(2) at the intended location in the picture.
5. Save the adapted process picture and close it.
Fig. 4-8
Integration of a SITOP 24 V Power Supply in PCS 7
Entry ID: 109481908,
V1.0,
1
2
04/2016
20