Download Print this page

Keysight N5242-60107 Installation Note page 31

Add 4-port capability upgrade kit

Advertisement

Description of the Upgrade
Installation Procedure for the Upgrade
1. On the analyzer's Help menu, click About Network Analyzer.
2. Verify that "400" is listed after "Options:" in the display. Click OK.
If Option 400 has not been enabled, perform the
Procedure"
Technologies. Refer to
Step 26.Perform Post-Upgrade Adjustments and Calibration
Adjustments
The following adjustments must be made due to the hardware changes of the
analyzer.
— default EE
— source adjustment
— receiver adjustment
— receiver characterization
These adjustments are described in the PNA Service Guide and in the PNA
on-line HELP. A list of equipment required to perform these adjustments is also
found in the service guide.
To view this service guide information, click the Chapter 3 bookmark "Tests
and Adjustments" in the PDF Service Guide
After the specified adjustments have been performed, the analyzer should
operate and phase lock over its entire frequency range.
Operator's Check
Perform the Operator's Check to check the basic functionality of the analyzer.
For instructions, click the Chapter 3 bookmark "Tests and Adjustments" in the
PDF Service Guide
If you experience difficulty with the basic functioning of the analyzer, contact
Keysight. Refer to
Calibration
Although the analyzer functions, its performance relative to its specifications
has not been verified. It is recommended that a full instrument calibration be
performed using the analyzer's internal performance test software. To view
information on the performance test software, click the Chapter 3 bookmark
"Tests and Adjustments" in the PDF Service Guide
Installation Note N5242-90015
again. If the option is still not enabled, contact Keysight
"Getting Assistance from Keysight" on page
1
.
"Contacting Keysight" on page
"Downloading the Online PNA Service Guide" on page 6
1. See
"Option Enable
1
.
4.
1
.
.
4.
31

Advertisement

loading