Description of the Upgrade
Installation Procedure for the Upgrade
Step 15.Install the Second Source Boards
Install Cables on Source 2 Board
Refer to
listed in
1. Attach new cables W5 (N5222-20062) and W7 (N5222-20063) to the A8
2. Use a 5/16-in torque wrench set to 10 in-lbs to tighten the cable
22
Figure 10
of this document for this part of this step. New parts are
Table 1 on page 8
26.5 GHz source 2 board as shown. Make sure that both cables are parallel
to the A8 26.5 GHz source board as shown in the END VIEW. Cable W5 is
the longer of the two cables.
connectors.
of this document.