FAAC 455 D Supplemental Installation Instructions

FAAC 455 D Supplemental Installation Instructions

Hide thumbs Also See for 455 D:

Advertisement

T
4 5 5 D C
H E
S
U P P L E M E N T A L
I
N S T R U C T I O N S
CONTENTS
Connect Other Devices
Learning Times with Gatecoder
Logic Tables of 455 D Control Panel
Safety in Gate Design
Maintenance
O N T R O L
I
N S T A L L A T I O N
2
2
2
3
3
4
6
8
10
10
10
11
12
14
14
16
Note: These instructions supplement the
installation manual for your operator. Be
sure to review all safety information in the
installation manual for your operator.
P
:
A N E L
November, 2003
455 D Control
Panel Installation
Instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 455 D and is the answer not in the manual?

Questions and answers

Summary of Contents for FAAC 455 D

  • Page 1: Table Of Contents

    Set Other Operating Controls Programming Learning of Operating Times Learning of Normal Times Learning Times with Gatecoder Automated System Test Logic Tables of 455 D Control Panel Safety in Gate Design Maintenance Limited Warranty FAAC International, Inc. 303 Lexington Avenue Note: These instructions supplement the installation manual for your operator.
  • Page 2: General Description

    ESCRIPTION gate system meets all applicable electrical codes. The installer should refer to the installation manual The FAAC 455 D control panel is used to operate the for a given operator for more information. following models. : An installation is U.L. compliant only...
  • Page 3: Connect The Operator(S) To The Control Panel

    November, 2003 Page 3 455 D Control Panel Installation Instructions In order to wire motor 2 in a bi-parting system, connect ONNECT THE PERATOR TO THE the white wire to terminal 4 (on the J4 terminal strip), ONTROL ANEL the black wire to 5, the red wire to 6. Wire each leg of the capacitor (supplied) to terminals 5 &...
  • Page 4 J1. In most cases, this source can be the path of the moving gate during your test. used to power 24 VDC accessories. : The 455 D control panel allows a maximum Disengage the operator(s) with the Manual Release key accessory load of 800 mA.
  • Page 5 U.L. Listed gate normally open (N.O.) contacts. Connect such devices to operator(s) terminals 9 and 14. : The FAAC radio receiver plugs into the 5 prongs labeled J2 (Quick connect port). OP_A Command Given No Command Page 7 shows how to connect a three or four wire receiver.
  • Page 6: Set Other Operating Controls

    THER PERATING ONTROLS For all FAAC hydraulic operators using the 455 D control panel, the force must be set at its maximum WARNING! Turn the main power off before you setting of 50 in order to supply the correct voltage to make any electrical connections.
  • Page 7 November, 2003 455 D Control Panel Installation Instructions Page 7 Magnetic Lock Free Exit Loop/ Phone/ Firebox (Hold Open Dev ices) Lock 12 vac Relay N.C. N.O. Shadow Loop FAAC Rev ersing Photocells (f or opening) Additional Reversing Devices Coil Voltage =...
  • Page 8: Programming

    November, 2003 Page 8 455 D Control Panel Installation Instructions ROGRAMMING BASIC PROGRAMMING To program the automated system, the “Programming Mode” must be accessed. Programming is split into two parts: BASIC and ADVANCED. Display Function Default ASIC ROGRAMMING PERATING OGICS A = Automatic (Timer to Close) To access BASIC PROGRAMMING, press the “F”...
  • Page 9 November, 2003 Page 9 455 D Control Panel Installation Instructions ADVANCED PROGRAMMING Display Function Default NDICATOR ICHT If 0 is selected, the output functions as a standard indicator-light (lighted at opening and pause, flashing at closing, and off when gate closed).
  • Page 10: Learning Of Operating Times

    November, 2003 Page 1 0 455 D Control Panel Installation Instructions • When gate operator (1) reaches the position EARNING OF PERATING IMES that you want it to slow down, an open command must be given to start the slow...
  • Page 11: Automated System Test

    November, 2003 Page 1 1 455 D Control Panel Installation Instructions • When gate operator (2) reaches the position that OMPLETE EARNING you want it to slow down, an open command must be given to start the slow down phase. When the...
  • Page 12 November, 2003 Page 1 2 455 D Control Panel Installation Instructions A (Automatic) Logic (455 D) Gate Status Open A Open B Stop Opening Closing Warning Reversing Reversing Light Device(s) Device(s) Opens single leaf Opens both leaves connected to Motor...
  • Page 13 No effect No effect Stopped Closes the leaves Closes the leaf (opening is No effect opening is inhib- inhibited) ited) EP (Semi-automatic, Step by Step) Logic (455 D) Gate Status Open A Open B Stop Opening Closing Warning Reversing Reversing...
  • Page 14 November, 2003 Page 1 4 455 D Control Panel Installation Instructions AFETY IN ESIGN • • A gate is a potential traffic hazard, so it is important The operating controls for an automatic gate must that you locate the gate far enough away from the...
  • Page 15 November, 2003 455 D Control Panel Installation Instructions Page 1 5 This page is left blank intentionally.
  • Page 16: Limited Warranty

    Neither FAAC S.p.A. related systems and equipment manufactured by FAAC or FAAC International, Inc., shall be liable for any loss or S.p.A. and distributed by FAAC International, Inc., to be damage whatsoever resulting, directly or indirectly, free from defects in material and workmanship under from the use or loss of use of the product(s).

Table of Contents