Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Checking the high limit safety cut-out setting................................................................ 10
2. Filling the heating system with water and venting......................................................... 10
3. Filling the trap with water.................................................................................................. 10
4. Opening the boiler.............................................................................................................. 10
5. Checking the gas type....................................................................................................... 12
6. Converting to natural gas LL............................................................................................ 13
7. Conversion to LPG P......................................................................................................... 14
8. Commissioning the system............................................................................................... 15
9. Reducing operational output (if necessary).................................................................... 16
10. Checking the static pressure and supply pressure........................................................ 17
11. Checking the rotary damper setting................................................................................. 18
13. Checking the CO content.................................................................................................. 23
14. Checking the flue gas temperature.................................................................................. 23
15. Displaying the ionisation current..................................................................................... 23
16. Opening the boiler door..................................................................................................... 24
17. Cleaning the combustion chamber and heating surfaces............................................. 24
18. Checking gaskets and thermal insulation sections........................................................ 25
20. Cleaning and reconnecting the condensate drain system............................................. 25
22. Checking the burner gauze assembly.............................................................................. 26
23. Checking the ignition electrodes and ionisation electrode........................................... 28
24. Cleaning the burner........................................................................................................... 28
25. Fitting the fan...................................................................................................................... 28
26. Closing the boiler door...................................................................................................... 29
27. Burner electrical connection............................................................................................. 29
28. Checking for tightness on the flue side........................................................................... 30
29. Automatic tightness test of gas train valves................................................................... 30
30. Checking the gas train filter element............................................................................... 30
31. Checking the filter element in the gas line...................................................................... 31
32. Checking the connections on the gas side for tightness............................................... 31
33. Performing final checks..................................................................................................... 31
34. Checking the water quality................................................................................................ 31
used (DCC system)............................................................................................................ 31
37. Checking the expansion vessel and system pressure................................................... 32
38. Checking the mixer for ease of operation and leaks...................................................... 32