Download Print this page

Keysight N5242-60115 Installation Note page 30

Add 4-port capability upgrade kit

Advertisement

Step 27. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until the cushioning material touches the
front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
Installation Note N5242-90115
29

Advertisement

loading