Download Print this page

Keysight N5242-60115 Installation Note page 20

Add 4-port capability upgrade kit

Advertisement

Step 12.
Install the LED Boards and Test Port Coupler Assemblies to the Test Set Front
Plate
1. Remove two screws from each LED board and remove the boards from the 2-port test set front plate of the
PNA.
2. If your analyzer's serial number is MY/SG/US5321 and above: 
Remove the bulkhead connectors from the 2-port test set front plate of the PNA. They will be installed later
in the 4-port test set front plate.
3. Remove the 2-port test set front plate from the test set deck.
4. Follow the two instructions shown in
this document.
Figure 6
LED Board Assemblies and Test Port Coupler Assemblies Installation
Installation Note N5242-90115
Figure 6
of this document. New parts are listed in
Table 1 on page 8
of
19

Advertisement

loading