Mounting And Set-Up - Vents MICRA 80 A3 User Manual

Energy recovery air handling unit
Table of Contents

Advertisement

8

MOUNTING AND SET-UP

Install the unit using the master plate from the scope of delivery and two Ø 125 mm ducts of required length.
Make 4 holes (Ø 8 and 60 mm deep)
in the wall using a master plate
Cable exit from the unit
2 holes for the round Ø 150 mm duct.
Fill the gaps between the wall and
the air duct with a mounting foam
Unit mounting sequence:
1. Fix the master plate (included in the scope of delivery) to the wall
at required level using adhesive tape.
2. Use a master plate to mark two Ø 150 mm holes for the air ducts and four Ø 8 mm holes for the dowels.
3. Remove the master plate and drill through holes for the air ducts and the 60 mm deep holes for the dowels. The through holes for the air ducts
must be sloped down by 2-3°. After that insert the dowels from the scope of delivery into the respective holes. While preparing the holes consider
the method of laying the power cable. The cable exit from the unit is shown on the master plate.
Insert the dowels into the holes.
CARDBOARD MASTER PLATE FOR HOLE MARKING, MM
UNIT MOUNTING
www.ventilation-system.com
370
200
85
Make 4 holes (Ø 8 and 60 mm deep)
in the wall using a master plate
35
300
Cable exit from the unit
2 holes for the round Ø 150 mm duct Fill
the gaps between the wall and the air duct
with a mounting foam
Ø 8 mm and 60 mm deep
Cable exit from the unit
2 holes for the round Ø 125 mm duct Fill
the gaps between the wall and the air duct
Install the air ducts with the slope 2-3° down-
wards to prevent ingress of liquid and foreign
objects into the unit from outside.
100
415
615
160
100
drill 4 holes in the wall,
with a mounting foam

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micra 80 a4

Table of Contents