Powernet built-in fourfold ir sensor

Advertisement

GIRA
Powernet Built-In Fourfold IR Sensor
Info
Installation Instructions
Powernet Built-In Fourfold IR Sensor

System Information

This device is a product of the Gira-Powernet
technical knowledge obtained in instabus or Gira-Powernet
proper understanding.
The functionality of this device depends upon the software. Detailed information on loadable software
and attainable functionality may be taken from the manufacturer's ETS2 product database as well as
®
from the Gira-Powernet
Planning, installation and commissioning of the unit is done by means of the ETS2 software, Ver. 1.1
or later, as well as by the Gira-Powernet

Function

This IR sensor receives up to eight IR channels from an infrared hand or wall-mounted transmitter,
evaluates them and sends commands to the Gira-Powernet
application chosen.
In receiver
of the IR sensor, a key
EIB system when projected together with the ETS2 and operated.
L
N
230 V AC ~
50 Hz

Connection Line between Receiver and IR Sensor:

The line must not be laid in parallel with lines carrying mains voltage or with load lines. A distance of a
few centimetres should be kept to avoid electromagnetic radiation.
A2
A1
illustration
Powernet Built-In Fourfold IR Sensor
®
EIB system and complies with EIBA directives. Detailed
EIB controller database.
®
EIB controller.
is integrated which can send a telegram to the Gira-Powernet
N
L
illustration
12/97
®
EIB training courses is a prerequisite to
®
EIB system, depending upon the
ws
gb
gn
br

Installation

Note when the receiver is driven by a wall-
mounted transmitter: Install the receiver within the
radiation area of the wall-mounted transmitter.
Distance (A2) from the wall to the receiver must
be at least distance (A1) between the wall-
mounted transmitter and the ceiling (refer to
illustration
).
Art. Nr.: 0873 00
®
Page 1 of 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 0873 00 and is the answer not in the manual?

Questions and answers

Summary of Contents for Gira 0873 00

  • Page 1 EIB system, depending upon the application chosen. ® In receiver of the IR sensor, a key is integrated which can send a telegram to the Gira-Powernet EIB system when projected together with the ETS2 and operated. 230 V AC ~ 50 Hz illustration Connection Line between Receiver and IR Sensor: The line must not be laid in parallel with lines carrying mains voltage or with load lines.
  • Page 2 GIRA Powernet Built-In Fourfold IR Sensor Info Installation Instructions Installation Sequence: 1. Drill a 13 mm hole into the intermediate ceiling. 2. Set the clamping spring of the IR receiver to ceiling thickness (refer to illustration 14-16 3. Insert the receiver supply cable with its four wire 10-13 ends into the hole.
  • Page 3 Gira Giersiepen GmbH & Co. KG Postfach 1220 D-42461 Radevormwald Telefon: +49 / 21 95 / 602 - 0 Telefax: +49 / 21 95 / 602 - 339 Internet: www.gira.de Powernet Built-In Fourfold IR Sensor 12/97 Page 3 of 3...

Table of Contents