Figure 6-3 Installation positions of equipment for the TP1102-65
1. Codec
5. Network switch 6. Speaker system (with the subordinate
After the equipment is positioned, power on the power supply controller, network switch, and
telepresence host, and ensure that no foreign objects fall into the equipment, affecting the running
of the telepresence system.

6.3 Installation Sequence

Based on the rack structure, the following TP1102-55 and TP1102-65 devices must be installed
in the sequence as follows:
l
Issue 03 (2013-07-22)
2. Power supply controller
speaker on the left and the main speaker
on the right)
CAUTION
For the TP1102-55 telepresence system:
1.
Network switch
2.
Codec and its power supply
3.
Power supply controller and its power supply
4.
Telepresence host and its power supply
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Equipment in the Rack
3. Telepresence host
4. Interface box
7. PDU with five outlets 8. PDU with one outlet