Component List; Installation Procedure - Huawei TP1102 Telepresence V100R001 Installation Manual

Table of Contents

Advertisement

HUAWEI TP1102 Telepresence
Installation Guide

8.1 Component List

Before installing the front panel, have the components listed in
Table 8-1 Front panel component list
No.
1

8.2 Installation Procedure

Context
Install the front panel after the equipment in the rack is installed, connected, and commissioned.
The front panel installation for the TP1102-65 and TP1102-55 is similar. The front panel
installation for the TP1102-55 is used here as an example.
Procedure
Step 1 Loosen the screws at the bottom of the screen-sealing glass holder, as shown in
Issue 03 (2013-07-22)
Name
Front panel
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing the Front Panel
Table 8-1
ready in advance.
Quantity
Carton
No.
1
-
Figure
8-1.
53

Advertisement

Table of Contents
loading

Table of Contents