7.1 Component List

Before installing the screen-sealing glass assembly, have the components listed in
ready in advance.
Table 7-1 Component list for the screen-sealing glass assembly
No.
1
2
3
4

7.2 Installation Procedure

Prerequisites
The camera has been commissioned. For details, see the HUAWEI TP1102 Telepresence System
Commissioning Guide.
Context
Pay attention to the following items when installing the screen-sealing glass assembly:
l
l
The screen-sealing glass is comparatively large and heavy. Be careful when carrying it.
Installation of the screen-sealing glass assembly for the TP1102-65 and TP1102-55 is similar.
The installation of the screen-sealing glass assembly for the TP1102-55 is used here as an
example.
To install the screen-sealing glass assembly, attach the screen-sealing glass holder to the glass,
and mount them to the rack.
Issue 03 (2013-07-22)
Name
Screen-sealing glass
Screen-sealing glass holder
M4 x 16 countersunk screw
M6 x 16 hexagon socket screw
To protect the glass from scratches, clear the installation site and ensure that no obstacles
or sharp objects are around the screen-sealing glass assembly.
At least two persons are required to carry the screen-sealing glass. When carrying the
screen-sealing glass, use one hand to hold the bottom and the other hand on the top of the
screen-sealing glass.
DANGER
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing the Screen-Sealing Glass Assembly
Quantity
1
1
4
8
Table 7-1
Carton
No.
-
-
-
-
46

Advertisement

Table of Contents
loading

Table of Contents