Tiger JOHN DEERE 5083E Assembly Instructions Manual page 128

Assemblies for john deere 5101e, 5093e, 5083e
Table of Contents

Advertisement

MAINTENANCE
DAILY MAINTENANCE SCHEDULE
The following services should be performed daily or every 8 hours of service, following the detailed
maintenance instructions in the operators manual.
_______ Pump Drive Shaft: If required with drive shaft/coupler check for end play and lubricate at zerks.
_______ Crankshaft adapter: If equipped with rubber grommets check condition, replace if missing or
damaged.
_______ Pivot points: Inject grease until it appears at ends.
_______ Hydraulic fittings: Check for leaks with paper or cardboard. Tighten fittings or replace hoses
immediately.
_______ Knives: Inspect for missing or damaged knives, change (only complete sets) as needed.
_______ Belts: Check/Tighten/Replace belts as needed.
_______ Main Frame/Deck: Unless otherwise specified retorqued bolts according to torque specifications in
this section.
_______ Hydraulic Fluid Level: Add, if required, per fluid recommendations.
_______ Rear Flail Drive, Bearing Flange and Shaft Couplers: Grease as instructed in the detailed
maintenance section.
_______ Cutter Shaft and Ground Roller: Grease as instructed in the detailed maintenance section.
Service performed by:_______ Date:____/____/____ Hour
Meter:________
Maintenance Section
**This page may be copied and used as part of the daily maintenance routine.
Boom
Maintenance Section 4-30
©2011 Alamo Group Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

John deere 5093eJohn deere 5101eLynx

Table of Contents