CAME VLR01DX Installation Manual page 10

Shutter operator
Hide thumbs Also See for VLR01DX:
Table of Contents

Advertisement

Fastening the operator
If the bay width is less than the dimensions of the operator base(s), cut off any excess ❸. The emergency batteries
(item VLR05) may not be fitted.
Fitting the transmission arms and the slide rails
Fit the operator using suitable screws and dowels.
For the two-leaf swing configuration, install the MASTER
operator ❹ on the right and the SLAVE operator ❺ on
the left.
 Before fitting the transmission arm, lubricate the motor
shaft thread.
Fit the arm (also see detail
the motor shaft.
 Leave the lever loose so as to make it easier to insert
the arm skid in the slide guide.
need to be preassembled with a
loosened screws, for subsequent
) and the release lever on
The VLR08 and VLR09 arms
adjustment.
Always use all three of the
screws supplied.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vlr02Vlr01sx

Table of Contents