Download Print this page
Tennant 6100E Instruction Bulletin
Tennant 6100E Instruction Bulletin

Tennant 6100E Instruction Bulletin

Hide thumbs Also See for 6100E:

Advertisement

Quick Links

INSTRUCTION BULLETIN
NOTE: DO NOT DISCARD the Parts List from the Instruction Bulletin. Place the
Parts List in the appropriate place in the machine manual for future
reference. Retaining the Parts List will make it easier to reorder
individual parts and will save the cost of ordering an entire kit.
NOTE: Numbers in parenthesis ( ) are reference numbers for parts listed in Bill of Materials.
Installation instructions for kit number 9018722
SYNOPSIS:
This kit contains the parts needed to install the propel repair cable on 6100E sweepers.
Please follow step-by-step instructions.
SPECIAL TOOLS / CONSIDERATIONS: NONE
(Estimated time to complete: 1 hour)
PREPARATION:
FOR SAFETY: Before leaving or servicing
machine, stop on level surface, turn off
machine, and remove key.
1. Disconnect the battery cable from the
machine.
WARNING: Always disconnect battery
cables from machine before working on
electrical components.
2. Remove the left shroud from the machine and
set the shroud aside.
IB 9018723 (04- 2019)
PROTECT THE ENVIRONMENT
Please dispose of packaging materials, used machine components
such as batteries and fluids in an environmentally safe way according
to local waste disposal regulations.
Always remember to recycle.
INSTALLATION:
1. Disconnect the main wire harness propel
leads from the controller M1 and M2
terminals. (Fig. 2/Fig. 3/Fig. 4)
2. Cut the connectors from the main wire
harness leads disconnected from the
controller and use electrical tape to secure the
leads back against the harness. Be sure all
exposed wire is completely covered with tape.
3. Disconnect the main wire harness from the
drive wheel assembly. (Fig. 2/Fig. 3/Fig. 5)
4. Cut the connectors from the main wire
harness leads disconnected from the drive
wheel assembly and use electrical tape to
secure the leads back against the harness.
Be sure all exposed wire is completely
covered with tape.
5. Connect the propel repair cable (1) to the
controller M1 and M2 terminals. (Fig. 2/
Fig. 3/Fig. 6)
No. 9018723
Machine: 6100E
Published: 04- 2019
Rev. 00
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 6100E and is the answer not in the manual?

Questions and answers

Summary of Contents for Tennant 6100E

  • Page 1 NOTE: Numbers in parenthesis ( ) are reference numbers for parts listed in Bill of Materials. Installation instructions for kit number 9018722 SYNOPSIS: This kit contains the parts needed to install the propel repair cable on 6100E sweepers. Please follow step-by-step instructions. SPECIAL TOOLS / CONSIDERATIONS: NONE...
  • Page 2 6. Route the propel repair cable (1) along the 11. Use the cable clamp (3) to secure propel main wire harness and down to the drive repair cable (1) and main wire harness to the wheel assembly. extension spring attached to the frame of the machine.
  • Page 3 Electrical panel on rear lintel Disconnect main wire harness connections from controller M1 and M2 terminals Remove and discard cable clamp. Replace with cable clamp (3) Frame of machine Extension spring connected to frame of machine Disconnect main Drive wheel wire harness adapter plate connections from...
  • Page 4 FIG. 3 IB 9018723 (04- 2019)
  • Page 5 FIG. 4 IB 9018723 (04- 2019)
  • Page 6 Ref. Description Qty. 1076611 Cable, Ele [6100, Propel, 8GA, Repair] 49266 Tie, Cable, Nyl, 07.3L .19W 1.8 Max D 67767 Clamp, Cable, Stl, 0.69D X 0.62W, 1Hole TENNANT COMPANY P. O. Box 1452 Minneapolis, MN 55440-1452 IB 9018723 (04- 2019)