Fig. 25
B
20. Pull the adapter (Fig. 25A) down fi rmly and tighten the
nuts (Fig. 25B) alternately to ensure the adapter is even.
If needed, use cement to seal between the fl ue pipe and
adaptor. Put the frame on (Fig. 12).
21. Refi t all loose parts that were removed from the product.
A
B
4.12 Performance check
Once the product has been assembled, always check the control
handles. These should move easily and work in a satisfactory
manner.
Fig. 26
Closed
C
Closed
The Jøtul C 24 is equipped with the following operating options:
Air vent (Fig. 26A)
Left position
closed
Right position
fully open
Ignition vent (Fig. 26B)
Left position
closed
Right position
fully open
ENGLISH
Open
A
B
Open
17