Download Print this page

Installation Requirements; Location; Bypass With Pressure Relief Valve; Electrical Connection - Grundfos NK Series Installation And Operating Instructions Manual

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

3. Installation requirements

3.1 Location

3.1.1 Installation position
Fig. 3
Horizontal installation of the products
3.1.2 Pit installation
WARNING
Accumulation of explosive gases from
shaft seal leakage
Death or serious personal injury
- Provide adequate ventilation if the
pump is installed in a pit. A minimum air
exchange of 1.5 times per hour is
required.

3.2 Bypass with pressure relief valve

CAUTION
Overheating
Minor or moderate personal injury
- The pump must not run against a closed
outlet valve or a closed shut-off element
as this may cause overheating. Install a
bypass with a pressure relief valve.
Observe the minimum flow rate. See section
1.2 Related installation and operating
8

4. Electrical connection

4.1 Earthing the pump housing

Fig. 4
Torque: 80 ± 16 Nm.
instructions.
DANGER
Electric shock
Death or serious personal injury
- The pump housing must be earthed.
DANGER
Ignition of explosive environment
Death or serious personal injury
- The pump housing must be earthed.
Remove coating from the earthing point to
ensure proper grounding connection.
Earthing point of the pump housing

Advertisement

loading

This manual is also suitable for:

Nkg series