Technical Details: Electrical Connection - Conditions - Wallbe Pro 3,7kW Installation And User Manual

Table of Contents

Advertisement

5.0 Technical details: electrical connection - conditions

Electrical connection-conditions
Model
Input terminal
Supply line
LS_switch/
preliminary fuse
RCD in switch
board
1. Be aware that you have to install an adequate LS-switch (see table) in the electrical
sub distribution!
2. Be aware that your wallbe Eco 2.0 is already equipped with a DC residual current
detection >6mA. Therefore a cost intensive RCD Type A (EV) or Type B in the switch
board is not necessary.
3. We strongly advise you to follow local norms and regulations.
23
If you have any further questions please contact us! Phone: +49-5252-989440
wallbe Pro
wallbe Pro
3,7kW
4,6kW
X1
X1
L1/N/PE
L1/N/PE
NYM-J
NYM-J
3x2,5mm²
3x2,5mm²
1 pol. x C 16A
1 pol. x C 20A
RCD Typ A
RCD Typ A
A0,03A/25A
A0,03A/25A
wallbe GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: inquiry@wallbe.de
wallbe Pro
wallbe Pro
7,4kW
11kW
X1
X1
L1/N/PE
L1/L2/L3/N/PE
NYM-J
NYM-J
3x6mm²
5x2,5mm²
1 pol. x C 32A
3 pol. x C 16A
RCD Typ A
RCD Typ A
A0,03A/40A
A0,03A/25A
wallbe Pro
22kW
X1
L1/L2/L3/N/PE
NYM-J
5x6mm²
3 pol. x C 32A
RCD Typ A
A0,03A/40A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 7,4kwPro 11kwPro 4,6kwPro 22kw

Table of Contents