Installation; Wall Mounting - Wallbe Pro 3,7kW Installation And User Manual

Table of Contents

Advertisement

6.0 Installation

6.1.1 Wall mounting

8.
Hold the cable holder at the desired installation position and mark the four
screwholes. (Distance between screwholes: 255mm x 255mm).
9.
Use an 8mm driller to screw the mounting holes into the wall. Use an 8mm dowel
for each of the screw holes.
10. Remove the Protection film from the adhesive tapes on your aluminum mounting
frames and place them horizontally onto your wallbe Pro. Please make sure that
that the mounting frame holes and wallbe Pro mounting holes are on top of each
other.
11. Mount your wallbe Pro, including the mounting frames and cable holder, onto the
wall.
12. Connect the supply line according to your wallbe Pro model. Please follow the
instructions in chapter "5.1 Supply line connection".
13. Remove the Protection film from your wallbe Pro cover
14. Mount the wallbe Pro cover on your charging station using the holes on the
mounting frames.
25
wallbe GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: inquiry@wallbe.de

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 7,4kwPro 11kwPro 4,6kwPro 22kw

Table of Contents