FP PostBase Vision Installation And Safety page 20

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

20
PostBase Vision
Load postage / Contact data centre
In order to frank, the PostBase Vision must
have corresponding postage credit. This re-
quires contact with the data centre.
• Follow the instructions on the display.
Home screen (example)
Installation complete
When PostBase Vision displays the Home
screen, the franking machine installation has
been successfully completed.
To install the "PostBase Vision Feeder", con-
tinue with Step 7.
The M
button is used to access other
ENU
system settings (e.g. PIN protection, standby
time).
Volume, display inclination and brightness
can be adjusted directly on the display frame.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Table of Contents