Maintenance Form - DeDietrich BPB 150 Installation, User And Service Manual

Independent domestic hot water tanks
Table of Contents

Advertisement

Fig.14
A
B
8.7

Maintenance form

Tab.8
No.
Date
Checks made
300027336 - v06 - 13062019
2. Replace the sheet gasket.
Tab.6
A
B
3. Remount the unit.
Caution
Use a torque wrench.
2
Magnesium anode: torque load 8 Nm.
The retaining screws on the inspection hatch must not be over
tightened.
Tab.7
Flange
Lip gasket
Sheet gasket
Important
Approximately 6 Nm is obtained by manipulating the box spanner
with the small lever and 15 Nm by manipulating it with the large
lever.
2
4. After reassembly, check the tightness of the lateral flange.
5. Proceed with commissioning.
For more information, see
Commissioning the appliance, page 19
MW-L000561-2
Remarks
Side inspection hatch without anode
Side inspection hatch with anode
Torque load
6 Nm +1/-0
15 Nm
By
8 Maintenance
Signature
BPB 150...501
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpb 300Bpb 200Bpb 401Bpb 501

Table of Contents