Transport And Installation; Machine Operation - Promac 349V Operating Instructions Manual

Metal band saw
Table of Contents

Advertisement

Available languages

Available languages

9.2 Noise emission
Acoustic pressure level (EN ISO 11202):
Idling
The specified values are emission levels and are not
necessarily to be seen as safe operating levels.
As workplace conditions vary, this information is intended
to allow the user to make a better estimation of the hazards
and risks involved only.

5. Transport and installation

5.1 Minimum requirements for storing the machine
- Environment temperature within –10 ºC to +50 ºC.
- Relative humidity cannot be over 90%.
- The machine stand must be placed stable on firm and
levelled ground.
We recommend foldable machine stand
Article Number 10048.
5.2 Assembly
If you notice transport damage while unpacking, notify your
supplier immediately. Do not operate the machine!
Dispose of the packing in an environmentally friendly
manner.
5.3 Mains connection
Mains connection and any extension cords used must
comply with applicable regulations.
The mains voltage must comply with the information on the
machine licence plate.
The mains connection must have a 10A surge-proof fuse.
Only use power cords marked H07RN-F.
Connections and repairs to the electrical equipment may
only be carried out by qualified electricians.
LpA 60,0 dB(A)
5.4 Start up
A=RED=OFF
To switch on the machine use the green button (B, fig 1) on
main switch.
Adjust the speed rotation with the knob (C, Fig 2) according
to the table.
Start the machine in pressing the control switch (D, Fig 2).
To release the control switch (D), the machine stops.
To take the machine out of operation, press the red button
(A, Fig 1) on main switch.

6. Machine operation

NOTE:
Before using the saw, pull the transport lock pin (A, Fig 3).
For transport lock it again.
4
Fig 1
B=GREEN=ON
Fig 2

Advertisement

Table of Contents
loading

Table of Contents