3.1.1
Preparations
3.2
Programming the system
Building Technologies
Fire Safety
Compact control panel CI1145 –> see document 008727
κ
Fit and connect the hardware
–
Control panel CC/CI
κ
according to system documentation:
Fit power supply unit
–
Connect mains cable and supply line
–
Fit board holder and attach connection cable
–
Set I bus address on all plug-in modules / set switches and bridges
–
Possibly, insert RAM and EPROMs on central plug-in module, operating ter-
–
minal and C bus gateway
Insert all plug-in modules
–
Attach I bus flat cable and 5 V/24 V supply cable via all I bus plug-in modules
–
Connect fire controls
–
Connect batteries
–
Operating terminal CT11
κ
Remove shielding hood, insert RAM and EPROMs, or possibly load other
–
Flash program file
Set bridges
–
Slide in designation strip
–
Connect C bus and supply line according to system document
–
Fit terminal
–
Plain text display terminal and plain text operating terminal
κ
Set LON bus address / set switch
–
Possibly remove resistor
–
Parallel display, 'Extinguishing' operating unit
κ
Set device address / possibly remove resistor array
–
Switching on for the first time
Establish mains voltage, note safety regulations in chapter 2
–
For start-up procedure –> see page 39
–
For programming the system –> refer to AlgoWorks online help.
Commissioning overview
11
008726_e_en_--
06.2017