Siemens CEREBRUS PYROTRONICS AD-3XRI Installation/Wiring Instructions
Siemens CEREBRUS PYROTRONICS AD-3XRI Installation/Wiring Instructions

Siemens CEREBRUS PYROTRONICS AD-3XRI Installation/Wiring Instructions

Air dust detector

Advertisement

Installation/Wiring Instructions
CERBERUS PYROTRONICS
Models AD-3XRI and AD-3XRILP
Air Duct Detectors
INTRODUCTION
CERBERUS PYROTRONICS
TECHNICAL DATA
Smoke Detector Compatibility
System/Module
System XL3
MXL Control Panel
System IXL (ICON-1) ILI-1B, ILI-1BH
System/Module
System XL3
MXL Control Panel
Siemens Building Technologies, Inc.
8 Fernwood Road
Florham Park, New Jersey 07932
P/N 315-093235-5
TM
TM
DI-BX3, DI-BX3H, ID-60IB, ID-60IBH, ILI-1B, ILI-1BH
ID-60IB, ID-60IBH, ILI-1B, ILI-1BH
Cerberus Division
Compatible Detectors
Compatible Detectors
ILP-1
ILP-1
Siemens Building Technologies, Ltd.
50 East Pearce Street
Richmond Hill, Ontario L4B 1B7 CN

Advertisement

Table of Contents
loading

Summary of Contents for Siemens CEREBRUS PYROTRONICS AD-3XRI

  • Page 1 System IXL (ICON-1) ILI-1B, ILI-1BH System/Module Compatible Detectors System XL3 ILP-1 MXL Control Panel ILP-1 Siemens Building Technologies, Inc. Siemens Building Technologies, Ltd. 8 Fernwood Road 50 East Pearce Street Florham Park, New Jersey 07932 Richmond Hill, Ontario L4B 1B7 CN P/N 315-093235-5...
  • Page 2 i t i a l f a l f a l f (ICON-1) DO NOT USE air duct detectors with Alarm Verification.
  • Page 3: Operation

    OPERATION Alarm Indication Alarm Condition Trouble Condition MOUNTING THE AIR DUCT HOUSING Location on Duct System...
  • Page 5 Mounting of the Air Duct Housing (See Figure 3) Sampling Tube Selection...
  • Page 7 Trimming the Inlet Sampling Tube (See Figure 4) Installation of the Sampling Tubes 3 16...
  • Page 8: Electrical Wiring

    8 32 8 32 Air Duct Sampling Tube Pressure Measurement CERBERUS PYROTRONICS ELECTRICAL WIRING Control of Normally Energized and De-Energized Devices NOTES: 1. All relay contacts shown repre- sent the condition they are in just after a reset pulse - the normal supervisory, no alarm condition.
  • Page 9 REQUIRED SEE NOTES 1 AND 2 SEE NOTES 1 AND 2 NOT USED NOT USED TO NEXT ZONE WIRES FROM SIEMENS ADDRESSABLE BUILDING TECHNOLOGIES, INC. DEVICE SYSTEM XL3 CONTROL PANEL Figure 6 Typical Connections for Models AD-3XRI and AD-3XRILP when used with XL3 NOTES: ground strap, using the proper conduit locking nuts.
  • Page 10: Installation

    REQUIRED SEE NOTES 1 AND 2 SEE NOTES 1 AND 2 NOT USED NOT USED TO NEXT ZONE WIRES FROM SIEMENS BUILDING ADDRESSABLE TECHNOLOGIES, INC. LISTED MXL DEVICE CONTROL PANEL OR ICON-1 (IXL) NOTES: 1. The relay contacts are shown just after a reset pulse, which metal ground strap, using the proper conduit locking nuts.
  • Page 11: Maintenance

    NOTES: 1. The device number of the detector is set by inserting program jumpers into the appropriate combinations of address holes located on the rear of the detector. 2. The Detector Device Number Table lists the device number, address, and jumpers required. 3.
  • Page 12: Periodic Testing

    Periodic Testing Siemens Building Technologies, Inc. Siemens Building Technologies, Ltd. 8 Fernwood Road 50 East Pearce Street Florham Park, New Jersey 07932 Richmond Hill, Ontario L4B 1B7 CN P/N 315-093235-5...

This manual is also suitable for:

Cerebrus pyrotronics ad-3xrilp

Table of Contents