Service; Service Schedule - Husqvarna GARDENA SILENO city Workshop Manual

Hide thumbs Also See for GARDENA SILENO city:
Table of Contents

Advertisement

7.1 Service schedule

The table below contains a checklist of points and actions to be taken when servicing the product. Complete service
plans can be found in Autocheck.
Every
Every
Action
year
3rd year
Disassemble the body and clean the chassis.
X
Check the ventilation filter and clean carefully
X
with a soft brush.
Check the tightening torque of screws on the
X
chassis.
Check the blades and blade screws.
X
X
Clean the charging station.
Check and polish the charging strips on the
X
product and the contact strips on the charging
station.
X
Make a complete
Check that docking and charging work correct-
X
ly.
Do a
X
battery condition.
Charge the battery.
X
Read the service bulletins for potential recom-
X
mended updates.
Replace the ventilation filter.
X
Open the chassis and replace the chassis seal-
X
ing strips.
1067 - 001 - 16.04.2019
Auto test in Autocheck.
Battery test in Autocheck and check the

7 Service

Explanation
Refer to
page 17 .
Refer to
ter on page 25 .
Refer to
Refer to
the Operator's manual.
Polish contact surfaces on both the product and
the charging station with a fine grade emery
cloth.
Refer to
Refer to
Symptoms during charging on page 40 .
and
Refer to
Always charge the battery fully before winter
storage. If this is not done, the battery may be
rendered useless due to voltage levels drop-
ping too low.
Updated service bulletins can be found in Au-
tocheck.
Refer to
ter on page 25 .
Refer to
page 28 .
To disassemble the body system on
To clean and replace the ventilation fil-
Screw fasteners on page 32 .
Maintenance - Replace the blades. in
Auto test on page 14 .
Symptoms during docking on page 40
Auto test on page 14 .
To clean and replace the ventilation fil-
To assemble the sealing strips on
Service - 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents