Download Print this page

Installation - Siemens SIMATIC SCALANCE X-300M PoE Compact Operating Instructions

Industrial ethernet switches

Advertisement

Note
During installation and operation, keep to the installation guidelines and safety notices
described in this document and in the system manuals "Industrial Ethernet / PROFINET
Industrial Ethernet" and "Industrial Ethernet / PROFINET passive network components".
You will find information on the system manuals in the chapter "Introduction", in the section
"Further documentation".
5.2

Installation

Note
When installing and operating the device, keep to the installation instructions and safety-
related notices as described in this document and in the manual "SIMATIC NET Industrial
Ethernet Twisted Pair and Fiber Optic Networks
en/view/1172207)".
5.3
Installing on an S7-300 standard rail
Procedure
1. Fit the top rear edge of the housing into the S7-300 standard rail.
2. At the bottom, the housing has two holes. Use these holes to screw the housing to the
standard rail.
3. Secure the cable for the power supply and the data and any other cables required (for
example for the signaling contact) according to the descriptions in the section "Connecting
up".
SCALANCE X-300M PoE
Compact Operating Instructions, 11/2019, A5E02630810-13
5.3 Installing on an S7-300 standard rail
(https://support.industry.siemens.com/cs/ww/
Assembling
33

Advertisement

loading