Installation of ZB-S 26, 18, 18C6, 10C6 in the EBR-S-2050 electrical service room

Installation of ZB-S 26, 18, 18C6, 10C6 in the
EBR-S-2050 electrical service room
GB
1. Align the system and screw-fasten to the rear wall of
the room.
Holes must be pre-drilled for fastening screws into the
fire protection material. Drill hole depth: max. 25 mm,
screw length: max. 25 mm.
2. Set up the technical ventilation (see the installation and
operating instructions ELECTRICAL SERVICE ROOM
PRIORACK-Elt EBR)
3. Disassemble the roof plate of the ZB-S. Mount the
cable interception system (see the drawing).
4. Feed in the cables.
5. Connect the system in accordance with the CEAG
ZB-S instructions and carry out commissioning of the
system.
Tabelle 2: Technical data
Type
Electrical service room including cable barrier
and ventilation barrier. Mounted ex works
CEAG part number
Electrical service room including cable barrier
and ventilation barrier. Self-assembly
CEAG part number
Installation of the system in an assembled
room is possible at a later date
Max. airflow [m³/h] acc to. EN50272-2
for boost charge*
Max. heat loss rate [W]*
No. of KRS 125 cable sealings for 26 cables
3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²
Max. no. of 2.5 mm² cables
Max. no. of 25 mm² cables
Dimensions [HxWxD; mm]
Weight (approx.) room/system [kg]
Accessories
Maximum number of supplementary KRS 125
cable sealings. Max. 26 cables per cable sealing
3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²
(see figure on page 5)
Plinth with plinth panel, width 1060 mm
CEAG part number
Plinth with plinth panel, width 810 mm
CEAG part number
Stop rail, cable infeed incl. fixing material
Mounting plinth for wall cabinets
Door stop, left
* Ventilation for the battery charge and heat dissipation must be provided.
O
8
Manual: ZB-S central battery system in electrical service rooms EBR-S 40071860238 (A) August 2014 www.ceag.de
CAUTION
ZB-S/26
EBR-S-2050-M
40036071113
EBR-S-2050
40036071112
no
800
4
78
10
2417x1144x736
692/180
6
EBR-S-2050-SO
40036071115
-
-
40071361160
-
ZB-S 26 and ZB-S 18 in
EBR-S-2050
ZB-S/18
ZB-S/LAD
EBR-S-2050-M
EBR-S-2050-M
40036071113
40036071113
EBR-S-2050
EBR-S-2050
40036071112
40036071112
no
no
700
600
4
4
78
8
10
10
2417x1144x736
2417x1144x736
692/170
692/170
6
6
EBR-S-2050-SO
EBR-S-2050-SO
40036071115
40036071115
-
-
-
-
40071361160
40071361160
-
-
No additional costs but 6 weeks of delivery time.
** Without batteries
ZB-S 18C6 and ZB-S 10C6 in
EBR-S-2050
Battery cabinet
ZB-S/10C
EBR-S-2050-M
EBR-S-2050-M
40036071113
40036071113
EBR-S-2050
EBR-S-2050
40036071112
40036071112
no
no
3.86
2.32
13
300
4
4
-
78
2
10
2417x1144x736
2417x1144x736
692/170**
692/155
6
6
EBR-S-2050-SO
EBR-S-2050-SO
40036071115
40036071115
-
-
-
-
-
40071361160
-
-