Glossary - Mennekes eMobility- Gateway Operating And Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 19
9. Disposal
Discard the device and packaging according
to regulations at the end of its service life.
Observe the national regulations for disposal
and environmental protection applicable in
the country of use. Old devices and batter-
ies must not be disposed of with household
waste.
f Dispose of packaging material in designated collection
containers.
f Dispose of old devices and batteries via your dealer.
10. Accessories
Accessories can be found on our website under
"Accessories".
https://www.chargeupyourday.com/

11. Glossary

Term
Explanation
ACU
Accounting Control Unit
Unit for communication with the SCUs
/ HCC 3s of the charging stations and
for connection to Backend systems.
An ACU is installed in the eMobility-
Gateway and in Smart charging sta-
tions.
Backend sys-
Software for controlling the
tem
charging stations and the manage-
ment of
personal access data.
HCC 3
Unit used to control each charging
point of an AMTRON
Xtra / Premium and communicate with
the vehicle.
RS 485-Bus
Interface standard for digital
data transmission. In this case:
Connection between
the ACU and up to 16 SCUs.
SCU
Socket Control Unit
Unit used to control each charging
point of a charging column / wall-
mounted charging station and com-
municate with the vehicle.
EN
15

Advertisement

Table of Contents
loading

Table of Contents