Chapter 6 Rack Installation; Overview; Unpacking The System; Preparing For Setup - Supermicro SC745BTQ-R1K28B User Manual

Hide thumbs Also See for SC745BTQ-R1K28B:
Table of Contents

Advertisement

6-1

Overview

This chapter provides a quick setup checklist to get your chassis up and running.
Following these steps in the order given should enable you to have the system
operational within a minimum amount of time.
6-2

Unpacking the System

You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage you should file a damage claim with
the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold your chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fields are generated. You will also need
it placed near a grounded power outlet. Be sure to read the Rack and Server Pre-
cautions in the next section.
6-3

Preparing for Setup

The box your chassis was shipped in should include two sets of rail assemblies,
two rail mounting brackets and the mounting screws you will need to install the
system into the rack. Please read this section in its entirety before beginning the
installation procedures
Choosing a Setup Location
Leave enough clearance in front of the rack to open the front door completely
(25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
This product is to be installed in a Restricted Access Location only, (dedicated
equipment rooms, service closets and others).
Chapter 6
Rack Installation
6-1
Chapter 6: Rack Installation

Advertisement

Table of Contents
loading

Table of Contents