Standard and Regulatory Listings
CE marked model:
Electrical:
Placement:
Tubing:
Time of Operation:
Recommended Storage and Shipping Temperature:
Environment:
Minimum Operating Time:
Stated concentration levels achieved after initial warm-up period (approximately 30 minutes).
10.2 O2 Indicators
Label Symbol
1154245-F-02
O
Purity
2
SYSTEM OKAY
O
over 85%
2
O
Between 73% to 85%
2
SYSTEM FAILURE
O
Below 73%
2
IEC/EN60601-1, A1, A2
IEC/EN60601-1-2
IEC/EN61000-3-2
IEC/EN61000-3-3,
ISO8359
MDD 93/42/EEC, Annex I and IX
IRC5PO2AW/IRC5PO2VAW
No extension cords.
No closer than 30,5 cm (12 in) from any wall, draperies, or furniture
to assure sufficient air flow
Avoid deep pile carpets and heaters, radiators or hot air registers
Floor location only
No confined spaces (Example: No closets)
2 m (7 ft) cannula with a maximum 15 m (50 ft) of Crush-Proof Tubing
(DO NOT pinch)
Up to 24 hours per day.
-29°C to 65°C (-20°F to 150°F), at 15-95% relative humidity.
Smoke and soot-free
No confined spaces (Example: No closets)
30 Minutes
Indicator Lights (LED)
GREEN Indicator Light
YELLOW Indicator light
1.
YELLOW Solid
2.
YELLOW Flashing Sensor
Failure
Call a qualified technician. Have a back-up supply of
oxygen ready.
RED Indicator Light
Continuous Audible Alarm
Sieve-GARD™ Compressor Shutdown.
Technical data
55