Assa Abloy Corbin Russwin FE6700 Series Installation Instructions Manual page 6

Multi-point lock for window shutter applications
Table of Contents

Advertisement

1
ASSA ABLOY, the global leader in door opening solutions
Before continuing to the next step be
certain the top pusher and bottom
bolt are in the correct position.
2
6
Step 4 – Alignment of
components in preparation for
drilling and pinning
· Bottom Bolt should be flush to the
bottom of the shutter.
· The lifting platform (item 1) should be
moved down the bottom rod and placed
against the shelf of the lifting platform
jig.
· Next secure the platforms position by
tightening the cone point set screw
(item 2). This will assure the point on
the set screw embeds itself firmly into
the bottom rod.
continued

Advertisement

Table of Contents
loading

Table of Contents