About This Documentation; Overview On Target Groups And Product Phases; Scope - Bosch Rexroth IndraControl XFE 01.1 Series Operating Instructions Manual

Extension modules profibus, rt-ethernet, sercos, can
Hide thumbs Also See for Rexroth IndraControl XFE 01.1 Series:
Table of Contents

Advertisement

Extension Modules Profibus, RT-
Ethernet, Sercos, CAN

1 About this documentation

1.1 Overview on target groups and product phases

In the following illustration, the framed activities, product phases and target
groups refer to the present documentation.
Example: In the product phase "Mounting (assembly/installation)", the target
group "mechanic/electrician" can execute the activity "install" using this docu-
mentation.
Product
Selection
phases
Presales Aftersales
Design engineer
Programmer
Technologist
Target
Process
groups
specialist
Select
Prepare
Activities
Design
Construct
Fig. 1-1: Assigning the present documentation to the target groups, product phases and ac-
tivities of the target group
This document instructs the technical staff of the machine manufacturer on how
to safely perform the mechanical and electrical installation and on how to com-
mission the device.
Required qualification: Individual who is able to assess the tasks assigned and
to identify possible safety risks owing to qualification in the subject, knowledge
and experience. The individual should also be familiar with the standards and
regulations.

1.2 Scope

This document is valid for all variants of the modules, whose type code starts
with: XFE01.1-FB ...
The type code specifications are located on the type plate of the module. Also
refer to
chapter 2 "Product identification and scope of delivery" on page
DOK-CONTRL -XFE**EXTMOD-IT04-EN-P
Mounting
Engineering
(assembly/installation)
Mechanic/
electrician
Programmer
Commissioning engineer
Unpack
Parameterize
Mount
Program
Install
Configure
Simulate
Bosch Rexroth AG
About this documentation
Commissioning
Operation
Technologist
Process specialist
Machine
operator
Maintenance
technician
Service
Optimize
Operate
Test
Maintain
Remove
faults
Create
the NC program
Decommissioning
Mechanic/
electrician
Disposal company
Dismount
Dispose
3.
1/37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents