Instructions for fitting connectors, attachments and devices
2.4 Optical networks
5. Place the ø 1.6 mm opening of the
stripping pliers marked with a white
dot on the orange colored core.
8. First remove the dust protection
caps. Push the preassembled plug
onto both cores at the same time as
far as it will go.
10. Tighten the two knurled nuts in the
direction of the arrow.
64
6. Position the cutter 30 mm from the
end of the core.
9. The arrow on the orange core points in the same direction as the arrow on
the SC RJ housing. The fibers of the plastic fiber-optic cable extend 5 to 10
mm out of the plug ferrules.
11. Shorten the excess fiber to 1 mm
with a sharp side cutter.
7. When the pliers are closed, the
sleeve is removed. The black core
is stripped in the same way.
12. Insert the plug into the SC RJ
grinding plate. The coding (stud) on
the plug housing is inserted into the
groove (1) of the grinding plate.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01