Siemens 6GK1 901-1GB01 System Manual page 45

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

7. Center the cable in the shield
clamp so that the power wires are
at the bottom in the shield clamp
and the braided shield makes
contact with the pressure surface
in the upper part of the outlet. (15.)
8. Fold down the upper part. (16.)
Make sure that the power wires do
not slip and are not jammed by the
lateral metal bars.
Keep to the rules in the SCALANCE W manual for fitting an IP67 hybrid cable connector to
a SCALANCE W device!
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
9. Tighten the two cover screws.
10. Tighten the insert screw until the
insert is flush with the casing of the
outlet.
WARNING
Instructions for fitting connectors, attachments and devices
11. Fit the outlet on a DIN rail or secure
2.3 Electrical networks
it to a smooth surface using the
three holes in the casing.
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents