Samsung AM JXVHGH Series Installation Manual page 31

Table of Contents

Advertisement

Examples of draining work
f Construct the drainage ditch with reinforced concretes and make sure that water-proofing work is done .
X
f For smooth draining of defrost water, make sure to apply 1/50 slope .
X
f Construct a drainage around the outdoor unit to prevent the defrost water (from the outdoor unit) from
X
stagnating, overflowing or freezing near the installation space .
f When the outdoor unit is installed on the roof, check the strength and waterproof status of the roof .
X
Classification
Models
A
B
DVM S HE_IM_DB68-05461A-08_EN.indd 31
X
100
B
A
<Drainage work for single installation>
<X-X' SECTION>
200
200
B
<Drainage work for module installation>
Small type
AM080/100/120✴XV✴G✴
940
740
X'
Direction of the
drainage (Slope 1/50)
150
100
Direction of the drainage
(Slope 1/50)
B
Large type
AM140/160/180/200/220/240/260✴XV✴G✴
1,350
1,150
(Unit : mm)
(Unit : mm)
31
2017-03-24 오후 1:38:18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am jxvhgr seriesAm hxvagh seriesAm100jxvagh/euAm120jxvagh/euAm140jxvagh/euAm160jxvagh/eu ... Show all

Table of Contents