SEN02641-02
29. Disconnect the clamp of wiring harness (35).
30. Move plates (36) and (37) together with wiring
harness (35) to the boom side.
31. Open the engine hood and remove cover (38).
32. Disconnect clamp (39).
33. Disconnect PPC hose (40) of the work equip-
ment. From the top, the color of the band is:
White
Brown
None
Blue
Black
Green
Red
Yellow
a Prepare an oil sump.
24
50 Disassembly and assembly
34. Pull out PPC hose assembly (41) of the work
equipment.
35. Sling floor frame assembly (42) and remove it.
a Make sure that the hoses, connectors,
clamps, and so on are disconnected with-
out fail.
4
Floor frame assembly: 250 kg
PC300, 350-8