Page 1
The units must be installed in accordance with these instructions, must be correctly certified for the specific operating environment and must be installed by suitably qualified personnel. If you have any queries about the installation or the certification of the unit – please contact Raytec for immediate assistance and advice.
3. If the SPARTAN unit is to be installed in areas of high vibration, please consult with Raytec. 4. The SPARTAN unit housing is constructed from marine grade aluminium and polycarbonate outer optic. The end user must ensure that these materials are suitable for the environment the SPARTAN unit will be installed in;...
2. Installation Mounting SPARTAN Unit 1. To meet the requirements of certification a MINIMUM of 2 fixing points must be used, the fixing points must be suitable for the conditions of use. 2. The rear of the unit has 3 blind sets of M8/M6 fixing points, a full range of mounting accessories are available including a range of pole clamps, ceiling mount brackets, various wall mount brackets, outreach bracket and chain mount eyelets.
Page 4
Typical wiring diagram - Standard Variants GREEN EARTH TO SCREW TO LED's BROWN BROWN BLUE BLUE WHITE WHITE WHITE/RED Typical wiring diagram - Emergency Variants GREEN EARTH TO SCREW TO LED's GREY BROWN BROWN BLUE BLUE WHITE WHITE WHITE/RED REMOVE LINK IF 4-CORE CABLE USED BLACK BLACK Wire the Mains cable into the terminal block.
Connect wires to mains supply. If the unit is opened for any reason, disconnect mains – On emergency luminaires there may be more than one mains supply All SPARTAN luminaires have terminal blocks suitable for looping 4mm2 cable, only one cable should be connected to each terminal block connection The battery fuse is located in the compartment that contains the battery, the fuse is disconnected after final manufacturing testing.
c. Self-test • Carried out at a random time every 3 month. • Checks the battery’s capacity and lamp’s condition. • Performs self-recovery for the battery if not at peak capacity. • Is carried out at 100% load • Discharges only 2/3 of the battery’s capacity. LED indication LED Indication Condition...
3. Maintenance It is essential that all SPARTAN units are maintained in accordance with the requirements of the EN60079-17 standard: (Electrical apparatus for explosive gas atmospheres – other than mines). IMPORTANT. No modifications are permitted to the unit, all spare parts must be purchased from the manufacturer, unauthorized modifications or spare parts will invalidate certification and make the equipment dangerous.
4. Technical Specification WL84-STD WL84-EM WL168-STD WL168-EM Input Voltage 110-254V AC/DC Input Current (230Vac, full load) 0.15A 0.3A Consumption Power Factor (230Vac, full load) >0.97 Mains Frequency 50/60Hz Inrush Current (I @50%) 20A, ∆t < 300µs 28A, ∆t < 300µs peak Total Harmonic Distortion (230Vac, full load) <10%...
Page 9
Max number of fittings allowed per MCB (Based on 230V) SPZ/SPX-WL84 SPZ/SPX-WL84 SPZ/SPX-WL168 SPZ/SPX-WL168 MCB Type Rating UK / Europe Tel: +44 (0) 1670 520055 www.raytecled.com Americas Tel: +1 613 270 9990...
Page 10
Declaration Of Conformity With The Atex Directive 2014/34/EU Raytec Ltd. declares under our sole responsibility that the product(s) listed below conform with the relevant provisions of directive 2014/34/EU of 20 April 2016 Manufacturer Raytec Ltd Unit 15, Wansbeck Business Park...
Page 11
CML16ATEX1130 or IEC Ex CML16.0052 Standard variants Emergency variants II 2 D Ex tb op is IIIC T80°C Db II 2 D Ex tb op is IIIC T76°C Db -40°C to +60°C -20°C to +50°C IP66 & IP67 110V-254V AC/154V-355V DC or 18-48V AC/18-69V DC Compliance with the Essential Health and Safety Requirements has been assessed by reference to the following standards - EN 60079-0 : 2012 + A11: 2013...
Page 12
UK / Europe T: +44 (0) 01670 520055 hazsales@raytecled.com Americas T: +1 613 270 9990 ushazsales@raytecled.com www.raytecled.com...
Need help?
Do you have a question about the SPARTAN SPX Series and is the answer not in the manual?
Questions and answers