The units must be installed in accordance with these instructions, must be correctly certified for the specific operating environment and must be installed by suitably qualified personnel. If you have any queries about the installation or the certification of the unit – please contact Raytec for immediate assistance and advice.
If the SPARTAN unit is to be installed in areas of high vibration, please consult with Raytec. Externally the SPARTAN unit housing is constructed from marine grade aluminium and polycarbonate outer optic, stainless steel brackets/fasteners and silicone gaskets, internally there are many non metallic components.
2. Installation Mounting SPARTAN Unit To meet the requirements of certification a MINIMUM of 2 fixing points must be used, the fixing points must be suitable for the conditions of use. The rear of the unit has 3 blind sets of M8/M6 fixing points, a full range of mounting accessories are available including a range of pole clamps, ceiling mount brackets, various wall mount brackets, outreach bracket and chain mount eyelets.
Page 4
Typical wiring diagram - WL84 STD, WL168 STD & WL84-HO GREEN TO LED’S BROWN BLUE WHITE WHITE/RED Typical wiring diagram - WL168-HO Typical wiring diagram - Standard Variants GREEN EARTH TO SCREW TO LED's BROWN BROWN BLUE BLUE WHITE WHITE WHITE/RED Typical wiring diagram - Emergency Variants Typical wiring diagram - Emergency Variants...
Page 5
Installer should earth the unit separately – an internal and external earth point are provided as standard at each end of the luminaire Connect wires to mains supply. If the unit is opened for any reason, disconnect mains – On emergency luminaires there may be more than one mains supply All SPARTAN luminaires have terminal blocks suitable for looping 4mm2 cable, only one cable should be connected to each terminal block connection.
Spartan Intelligent Emergency Operation Guide Operation b. Function Test • Carried out every 7 days. The light fitting will carry out the following • Checks the function of the battery, function automatically after installation: lamp and power supply. • Commissioning Cycle •...
Notes • The luminaire will switch off momentarily (<0.5sec) during the transition between a test and normal operation. • If a test was interrupted by a mains failure, the test will be halted, and the unit will enter emergency mode. Once the mains supply is back, the unit will allow 24 hours to recharge the battery before continuing the tests.
Protection Concepts CML14ATEX3119 or IEC Ex CML15.0001 or CML21UKEX3105 Standard variants Emergency variants II 2 GD Ex eb mb IIC T4 Gb II 2 GD Ex eb mb IIC T4 Gb Ex tb IIIC T80°C Db Ex tb IIIC T76°C Db -40°C to +60°C -20°C to +50°C CML15ATEX4138 or IEC Ex CML15.0068 or CML21UKEX4104...
Page 9
Inrush Current Typical Curve Twidth Max number of fittings allowed per MCB (Based on 230V) WL84 STD / WL168-EM / MCB Type Rating WL84-EM WL168-STD WL168-HO WL84-HO WL84-HO-EM Product Inrush Pk / Duration Imax50 WL84 STD / WL84-HO 23A (136us) WL84 EMX 12A (256us) WL168 STD...
Page 10
& UK Directive SI 2016 No. 1107 (as amended) Raytec Ltd. declares under our sole responsibility that the product(s) listed below conform with the relevant provisions of directive 2014/34/EU of 20th April 2016 and UK Directive SI 2016 No. 1107 (as amended)
Page 11
CML16ATEX1130 or IEC Ex CML16.0052 or CML21UKEX1100 Standard variants Emergency variants II 2 D Ex tb IIIC T80°C Db II 2 D Ex tb IIIC T76°C Db -40°C to +60°C -20°C to +50°C IP66 & IP67 110V-254V AC or 18-48V AC/18-69V DC Compliance with the Essential Health and Safety Requirements has been assessed by reference to the following standards - EN 60079-0 : 2018...
Page 12
For the most current and detailed information about our products, please contact our sales team at sales@raytecled.com Raytec Global (excluding Americas) Raytec Americas Tel: +44 (0) 1670 520055 Tel: +1 613 270 9990 sales@raytecled.com...